Oil Assets Potential
 
  • The inclusion of railways line connecting the energy city and the capital Manila it will cost well over $20bn to build.
  • Upon completion, the energy will value over $30bn
  • Venezuela asset will be our highest producing asset so far when it comes on stream because of its potential
  • We start developing our oil assets in Mauritania, Nigeria, and Kazakhstan this taking advantage of the low cost of production currently prevailing in the market.
  • Kampac Energy City is the largest energy city being built in the world at a cost of $5bn
  • Upon completion Kampac Energy City will be worth over $7bn
  • Nigeria - oil producing assets upon full production shall be 45,000 barrels per day
  • Total oil reserves in Nigeria estimated to be about 400M barrels
  • Kazakhstan - oil asset with the potential of producing 40,000 barrels per day with estimated reserve of about 500M barrels
  • Mauritania - estimated oil reserve of over 300M barrels with a potential of producing 35,000 barrels per day


Worldwide Activities
Oil Trading
Oil Infrastructure & Logistics
Exploration & Production
Oil Assets Potential
Oil and Environmental Services
RST Technology
Infrastructure Development
Refining Capacity
 
 
 
 
 
 
 
 
 
 
  • Multifaceted international Oil & Gas company
  • Established in 1988
  • 17 offices in 20 countries
Read More
Kampac Group ©2013, All rights reserved   Powered by sumtechnologies